Compliance · Geotechnical field services
Geotechnical field records, audit-ready at scale.
BoreDM
Paper borehole logs from rugged, high-liability field sites. Millions of legacy logs trapped in PDFs. Structify Industrial turned 45 minutes of manual transcription per report into 2-3 minutes, at $0.20 per record instead of $20. The records are now searchable, structured, and ready for engineering review and customer audits.
Why this matters for manufacturing & distribution
Field geotechnical and engineering services firms that feed construction and infrastructure share a problem with capital-intensive manufacturing: handwritten and PDF sources that must become structured, reviewable records, without turning your engineers into data entry staff.
Geotechnical field engineers still rely on paper in rugged, high-liability environments. Every handwritten borehole log had to be typed later (on the order of tens of minutes and dollars per report), while millions of legacy logs sat trapped in PDFs.
Results at a glance
- 0145m → 2–3mProcessing time per report (order-of-magnitude)
- 02~$1MLabor savings trajectory at scale
- 03$20 → < $0.20Transcription cost per report at scale (reported)
Before Structify Industrial
- Manual transcription was the bottleneck for both new work and backfills
- Enterprise digitization partnerships were not feasible at manual unit economics
- Engineering time leaked into clerical work
With Structify Industrial
- Processing time cut from roughly 45 minutes to about 2–3 minutes per report
- Transcription cost reduced from about $20 to under $0.20 per report at scale
- Enterprise-scale digitization partnerships that were not feasible with manual transcription
“The time Structify saves isn’t just saved. It’s reinvested. We can shift the budget from data entry into modeling, testing, and better field equipment: actual engineering value. That’s a game-changer.”
Founder & CEO | BoreDM
Related case studies
Manufacturing · Aerospace plastics manufacturing
From weeks of market research to same-day manufacturing prioritization.
LP Aero
80%
reduction in data entry and collection time
Read case study →Manufacturing · Food manufacturing
From four hours per quote to verified quotes in twenty minutes
Food manufacturer
2 days
from kickoff to live intake, matching, and verification
Read case study →Operations · Enterprise software integrations
From “too hard to measure” to cross-stack answers in minutes
Merge
24h → 30m
for a validated feedback analysis exercise
Read case study →Yours next?
Bring one audit you're dreading. We'll wire it up against your ERP and QMS and hand back a working version.


